The Gateway project is the new home of the College of Computing, Data Science, and Society (CDSS), the first new college established at UC Berkeley in more than 50 years. This 367,270-square-foot facility was designed to foster collaboration among approximately 1,325 faculty, students, researchers, and staff while advancing education and groundbreaking research.

The state-of-the-art building features a lower-level gathering space, five floors of research laboratories, classrooms, auditoriums, seminar and conference rooms, offices, social kitchens, a public café, and a rooftop event space.

Designed with sustainability at its core, the project is pursuing LEED certification and incorporates advanced low-carbon curtainwall systems, water-efficient fixtures, energy optimization strategies, and construction waste management practices.
Raymond’s Scope
Raymond partnered with Turner Construction to provide a comprehensive scope of work, including:
- Exterior framing and sheathing
- Interior framing
- Gypsum board and finish
- Acoustical plaster
- GFRG
- Insulation
- Firestopping
- Joint sealants
- Access doors
- Shaftwall systems
- Carpentry
- Prefabricated headers
Challenges & Solutions
One of the project’s greatest challenges was achieving the high-quality finish required for the extensive acoustical drywall ceilings. Natural light from the building’s expansive curtainwall system highlighted even the smallest imperfections. Raymond addressed this by providing additional quality training for field personnel, working closely with Armstrong on ceiling installation, and submitting Requests for Information (RFIs) to clearly define which areas required a Level 5 finish. Establishing these expectations early helped ensure a consistent, high-quality result.



Another significant challenge was the dense overhead mechanical, electrical, and plumbing (MEP) systems. Raymond developed prefabricated headers incorporating a truss system, eliminating the need for kickers and creating additional space for MEP trades. This innovative approach improved coordination, simplified installation, and helped keep the project on schedule.

Innovation
The Gateway project features a highly distinctive architectural design with sweeping radius walls, curved ceilings, premium millwork, epoxy flooring, Acoustibuilt ceilings, and an expansive curtainwall system.
To improve accuracy and efficiency, Raymond utilized Dusty Robotics for field layout and implemented prefabricated headers throughout the project. These technologies streamlined installation, enhanced coordination with other trades, and supported the project’s demanding schedule and quality standards.