Gain speed, value and quality

with exterior Sto Panel

Benefits of
Sto Panel construction

As a StoPanel affiliate, The Raymond Group is partnered with Sto Corp.—the world’s number one manufacturer of exterior wall systems. The Sto Panels that Raymond provides combine the latest technology and proven products to deliver the most energy efficient, architecturally versatile exteriors in the construction industry today, employing a process that saves time, adds value and improves quality.


SPEED

Greatly reduce the time of building envelope installation and make the most of your construction calendar.

  • Fast-Track, Systemized Panel Manufacturing
  • Efficiencies Compress the Construction Schedule
  • Indoor Production Means No Weather Delays
  • Site Prep and Panel Construction Can Occur Simultaneously
  • Reduced Multi-Trade Vendor Coordination
  • Faster Installation Due to Prefab Panelization
VALUE

Reduce the cost of your project by eliminating scaffolding and other complications of working at high elevations.

  • Lightweight Panels Lower Structural Requirements
  • Smaller Footings / Foundations
  • Reduced Jobsite Labor & Crew Sizes
  • No Jobsite Scaffolding Required
  • Decreased Volume of Project Concrete
  • Reduced Drywall Furring, Boxing and Strapping
QUALITY

Sto panels are produced in temperature-controlled factories, in full compliance with codes for testing, building and energy efficiency

  • Sto Prefab Panels Have ISO-Engineered Components
  • Sto Q/A Programs Ensure Quality-Controlled Workmanship
  • Strict Adherence to Manufacturers’ Temp/Humidity Guidelines
  • Extensive Architectural and Finish Options
  • Superior Fire, Acoustical and Thermal Performance
  • Superior Long Term Durability with Industry-Leading Warranty
15
TIMES SAFER

Manufacturing is 15 times safer than traditional construction. Building panels in a horizontal, ground level environment and installing them from a crane greatly reduces the risk involved in building off scaffolds.

80%
Less Time

Reduce your building envelope installation time by up to eighty percent when compared to conventional field-installed construction methods.

90%
Less Weight

Take advantage of continuous insulation panel walls that can have up to ninety percent less weight than other panel and conventional wall types.

6 vs. 60
Less Manpower

Easy installation means less labor. Reductions can be as much as going from 60 workers to 6 when compared to typical on-site construction methods.