Scaffolding Innovation from Raymond

Posted April 24, 2023

Raymond’s Las Vegas region recently completed the Resorts World Theatre project, part of the Resorts World Las Vegas development. The theater is a state-of-the-art, 5,000-capacity, concert and entertainment venue with two private lounges, special access bars, and VIP opportunities. Raymond was contracted by W.A. Richardson to complete framing, firestopping, drywall, finishes, painting, wallcoverings, and acoustical ceilings and treatments.

To help fulfill the project’s scaffolding needs, Raymond partnered with Leading Edge – a full service scaffolding company that provides complete scaffolding design, engineering, erection, and dismantle services. Raymond and Leading Edge were challenged on the theater project with keeping the area below the scaffolding open and minimizing exposure of the framing and concrete work that would be going on below.

The team came up with the concept of a rolling unit to minimize the point load on the bottom cords, speed up erection and take down time, ease accessibility with ability to take a manlift directly to the scaffold platform, and open the underfloor allowing other trades to work concurrently. Watch more below!

OTHER NEWS

GEARYS Beverly Hills
GEARYS Beverly Hills was a high-end tenant improvement and renovation of an existing retail building in the exclusive Rodeo Drive shopping district. Raymond was contracted by Alain Hirsch to perform exterior non-load bearing framing, glass-mat sheathing, weatherproofing barriers, lath and plaster ...
IQHQ
The IQHQ Research and Development District (RaDD) occupies six blocks and, at completion, represents the largest urban commercial waterfront site along the California coast. The life-science mixed-use development is comprised of mid-rise buildings, a 17-story tower, and ground floor retail, dining, ...

Subscribe to get

the latest updates

    This site is protected by reCAPTCHA and Google Privacy Policy and Terms of Service.

    CONNECT WITH US • CONNECT WITH US •