Blog

Posted April 14, 2021
The Raymond Group has joined the growing coalition pledging to advance diversity and inclusion in the workplace. One of nearly 2,000 CEOs that have come together for CEO Action for Diversity & Inclusion, Raymond CEO Travis Winsor has committed himself and Raymond to take action and continue cultivating a workplace where diverse perspectives and experiences […]
Posted March 31, 2021
The Raymond Group congratulates Alex Movel on his recent promotion to Vice President & Area Manager of our Las Vegas region. Alex will oversee all aspects of business development, project management, estimating and field operations. Alex will be taking over the responsibilities of Kim Lorch, who is set to retire April 30th, 2021 after 28 […]
Posted March 11, 2021
At Raymond, we have some outstanding employees, so we decided to feature them on our blog. We’d like to highlight San Diego carpenter Alberto Gonzalez. Alberto has been in the industry and with Raymond for 14 years, beginning as an apprentice. In 2013, Alberto was promoted to Project Foreman at our Jacobs Tower Medical Center […]
Posted February 25, 2021
The Uber Mission Bay project, located in San Francisco, included the tenant buildout of two buildings. Building-1 with a total of 11 floors (10 floors of office space and a first-floor childcare facility) and Building-2 with seven floors of office, meeting, kitchen and dining, and welcoming/event center space. Designed by RMW Architecture and ZGF Architects […]
Posted February 8, 2021
At Raymond, we have some outstanding employees, so we decided to feature them on our blog. We’d like to highlight Director of Prefabrication Scott Ross. Scott oversees all aspects of Raymond’s prefabrication operations, managing the drawing process, shop production, and coordination with field installation. Scott brings 20 years of experience in the industry to his position, […]
Posted January 15, 2021
The Westin Anaheim Resort is an 8-story, AAA 4-diamond hotel that includes 618 rooms, 47,542 square feet of flexible space, and 20,000 square feet of retail and restaurant space. Raymond (in a joint venture with Martin Bros.) was contracted by KCS West to perform the exterior framing, sheathing, waterproofing, lath, plaster, limestone/foam shapes, theming and precast products. […]
Posted December 31, 2020
As we move into the new year, Raymond would like to look back and highlight some of the invaluable organizations that we partnered with in 2020, as well as our employees that stepped up when those in our local communities have needed us most. At the same time, we want to recognize that many of […]
Posted December 14, 2020
Raymond extends our warmest wishes for a safe and happy holiday season, and a genuine thank you for your loyalty and goodwill throughout the year.
Posted December 4, 2020
Circa Resort & Casino has officially opened its doors as the first new ground-up gaming resort in downtown Las Vegas since 1980. The 1.25 million square foot property has six total floors with 777 guestrooms, an outdoor pool amphitheater with six rooftop pools, a two story casino, and a collection of dining and bar venues. […]
Posted November 24, 2020
The new Agua Caliente Casino Cathedral City is a 125,000 square foot development, featuring 30,000 square feet of casino floor and 5,000 square feet of restaurant space. Raymond performed the fireproofing, framing, hollow metal frames, insulation, drywall, taping, painting, wallcovering, and installation of several specialties for The PENTA Building Group. The exterior design of the […]

Subscribe to get

the latest updates

    This site is protected by reCAPTCHA and Google Privacy Policy and Terms of Service.